• Stainless Steel Casting Pipe Fitting End Cap Project Contracting
  • Stainless Steel Casting Pipe Fitting End Cap Project Contracting
  • Stainless Steel Casting Pipe Fitting End Cap Project Contracting
  • Stainless Steel Casting Pipe Fitting End Cap Project Contracting
  • Stainless Steel Casting Pipe Fitting End Cap Project Contracting
  • Stainless Steel Casting Pipe Fitting End Cap Project Contracting

Stainless Steel Casting Pipe Fitting End Cap Project Contracting

Head Code: Round
Connection: Female
Shape: Equal
Customization:
Shipping Cost:

Estimated freight per unit.

about shipping cost and estimated delivery time.
Payment Method: visa mastercard discover JCB diners club american express T/T
  Initial Payment Full Payment
Currency: US$
Return&refunds: You can apply for a refund up to 30 days after receipt of the products.
From payment to delivery, we protect your trading.
Stainless Steel Casting Pipe Fitting End Cap Project Contracting pictures & photos
Stainless Steel Casting Pipe Fitting End Cap Project Contracting
US $1.28-2.16 / Piece
Min. Order: 300 Pieces
Diamond Member Since 2012

Suppliers with verified business licenses

Secured Trading Service
Rating: 5.0/5
Guangdong, China
Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Years of Export Experience
The export experience of the supplier is more than 10 years
Experienced Team
The supplier has 8 foreign trading staff(s) and 5 staff(s) with over 6 years of overseas trading experience
to see all verified strength labels (25)
  • Overview
  • Product Description
  • Company Profile
  • FAQ
Overview

Basic Info.

Model NO.
CC88
Material
Stainless Steel
Technics
Casting
Certification
ISO, API
Special Function
Anti Corrosion
Application
Buliding
Surface
Satin or Mirror
Thickness
0.8mm to 2.5mm
OEM/ ODM
Provided
Color
According to Customers′ Demand
Diameter
33.7/38.1/42.4/48.3/50.8mm
Transport Package
1PC/Inner Box
Specification
CE, ROHS, SGS
Trademark
ABLinox
Origin
Guangdong
HS Code
730890000
Production Capacity
100, 000PCS/Month

Packaging & Delivery

Package Size
3.00cm * 3.00cm * 4.50cm
Package Gross Weight
0.300kg

Product Description

Product Description

 


Stainless Steel Casting Pipe Fitting End Cap Project Contracting

Ablinox Stainless Steel Casting Pipe Fitting End Cap

Name: Stainless Steel Connector Elbow
Function: For tube, handrail, balustrade connection
Diameter: 38.1/42.4//50.8mm, other sizes can be customized
Technique: Stainless steel lost wax casting design
Surface or finish: Satin;mirror;electroplating,PVD,etc
Material Analysis: SS304 - Nickel>8%, Carbon<0.08%
SS316 - Nickel>10%, Carbon<0.03%<>
OEM/ODM Available
MOQ 100 PCS
Package Foam bag, blank box, wooded case, pallet or as customers' request.

Advantange
  1. With our own stainless steel investment casting production lines and machining lines, give you one stop services.
  2. With CNC(CNC CENTER),we make the tooling by ourselves.Make you easiler.
  3. With 50000 square meters workshop located in Zhaoqing city, near Guangzhou port, transportation is convenient.
  4. Use Germany Spectrometer and Salty Spray to test the raw material.
  5. We have 15 engineers with strong ability in design and develop new products.
  6. With ISO 9001:2015, ISO 14001 and OHSAS 18001 system.
  7. With ERP system,We can give you the production and delivery information at the first time. Also if any quality problem,We can source it and give you the solution very fast.
  8. Fast reply within 12 hours.

Hot Sell Products

Stainless Steel Casting Pipe Fitting End Cap Project ContractingStainless Steel Casting Pipe Fitting End Cap Project ContractingStainless Steel Casting Pipe Fitting End Cap Project ContractingStainless Steel Casting Pipe Fitting End Cap Project Contracting

Stainless Steel Casting Pipe Fitting End Cap Project Contracting
Packaging

Stainless Steel Casting Pipe Fitting End Cap Project Contracting

 
Company Profile

 


ABLinox was founded in 2008 by Kate Liang, started from a 400 square meters workshop.
In 2009, Supported by customers and suppliers, ABL moved to a 4000 square meter workshop and expand our business all over the world.
In 2012, We have sold our products to more than 200 countries, and our brand existed
in more than 50 countries in the world.
In 2013, We have passed CUPC,NSF,CE and ROHS cetificate,starting entered into the European and American markets.
In 2014, with fast development, ABL moved to a 50000 square meters factory. We have our own stainless steel investment casting production lines and also completed machining equipments.
In 2015, We set up our management team. We have cooperated with some unversities and getting bigger. At the same time, we are also Alibaba training center.
From 2016 to 2017, ABL passed ISO 9001:2015, ISO14001, OHSAS18001 certificate. we have already cooperated with some top 500 enterprises.
In 2018, ABL focus more on the Lean Production and preparing for the next five years.
In 2019, We are going to build a testing center and achieve the higher sales goal.
In 2020,We have introduced more advanced measuring equipment to ensure the quality of products more accurately.


Stainless Steel Casting Pipe Fitting End Cap Project Contracting
Stainless Steel Casting Pipe Fitting End Cap Project Contracting
Production Process
 
Steps Time
Tooling Making CNC Center 7 days


Casting Process
Wax Injection 2 days
Sand Shell Molding 5 days
Dewaxing 1 days
Pouring 1 days
Cutting 1 days
Grinding 1 days
Cleaning 1 days


Machining Process
CNC 2 days
Drilling & Tapping 2 days
Welding 2 days
Stamping 1 days
Polishing 5 days

Assembling
Ultrasonic Washing 1 days
Water Testing 1 days
Assembling 2 days
Remark: The production time base on standard quantity and process

Stainless Steel Casting Pipe Fitting End Cap Project Contracting


Our mission
To change the world's view about Chinese product.
To be the leader in precision casting industry
Our dream
  1. To gain Win-win achievement with all of our clients and supplies
  2. To be an international famous brand.
  3. To be a one-hundred-year company
After-sales Service
  1. Reply you fast within 12 hours.
  2. Have someone to follow up all your inquiry and order.
  3. We will offer satisfied quality and prices to you.
Certifications
Stainless Steel Casting Pipe Fitting End Cap Project Contracting
 
FAQ
  1. Where is your factory?
Our factory located in Zhaoqing City, Guangdong Province. Factory 50000 square meters with 265 workers.
 
  1. What is your payment term?
We do T/T, 30% deposit, balance before delivery. We can also accept L/C.
 
  1. What is the production time?
Casting part need 20 to 30 days.
Balustrade and handrail accessories need 25 to 35 days.
Faucet and shower need 40 to 60 days.
 
  1. Is that possible to visit the factory?
Sure, we sincerely welcome you to visit our factory, we can also pick you from the hotel.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

From payment to delivery, we protect your trading.
Stainless Steel Casting Pipe Fitting End Cap Project Contracting pictures & photos
Stainless Steel Casting Pipe Fitting End Cap Project Contracting
US $1.28-2.16 / Piece
Min. Order: 300 Pieces
Diamond Member Since 2012

Suppliers with verified business licenses

Secured Trading Service
Rating: 5.0/5
Management System Certification
ISO 9001, ISO 14001, OHSAS/ OHSMS 18001, IATF16949, QHSE
Import & Export Mode
Have Own Export License
International Commercial Terms(Incoterms)
FOB, CIF, CFR