Products information
1, Material: High Quality stainless steel 304/316stainless steel.
2, Finish: Surface can be PSS(Polished Stainless Steel) or SSS(Satin Stainless Steel), or PVD (Vacuum Metallizing) for your choice
3, Using for top pipe: 38.1 42.4 50.8mm and for body diameter: 38.1 48.4 50.8mm pipe
4, Function: Handrail fittings, to join the top pipe to the handrail body
5, High quality, competitive price, prompt delivery...
6, Packing: Each one in a small fibre bags and 100 PCS in one carton
7, Service: Project plan, installation guide, and logistics service available, prompt delivery and after-sale service. If QC problem, ABL will bear all the claim
8, Remarks; 100% guarantee on the highest quality, if any QC question, ABL will bear the whole lose
Our R & D department is able to offer technical support for customers on the basis of your sample or drawing. A mold cost will be paid back if your order reaches a specific quantity.
Production Process
Steps |
Time |
Tooling Making |
CNC Center |
7 days |
Casting Process |
Wax Injection |
2 days |
Sand Shell Molding |
5 days |
Dewaxing |
1 days |
Pouring |
1 days |
Cutting |
1 days |
Grinding |
1 days |
Cleaning |
1 days |
Machining Process |
CNC |
2 days |
Drilling & Tapping |
2 days |
Welding |
2 days |
Stamping |
1 days |
Polishing |
5 days |
Assembling |
Ultrasonic Washing |
1 days |
Water Testing |
1 days |
Assembling |
2 days |
Remark: The production time base on standard quantity and process |
Company Introduction
ABL was founded in 2008 by Kate Liang, started from a 400 square meters workshop.
In 2009, Supported by customers and suppliers, ABL moved to a 4000 square meter workshop and expand our business all over the world.
In 2012, We have sold our products to more than 200 countries, and our brand existed
in more than 50 countries in the world.
In 2013, We have passed CUPC,NSF,CE and ROHS cetificate,starting entered into the European and American markets.
In 2014, with fast development, ABL moved to a 50000 square meters factory. We have our own stainless steel investment casting production lines and also completed machining equipments.
In 2015, We set up our management team. We have cooperated with some unversities and getting bigger. At the same time, we are also Alibaba training center.
From 2016 to 2017, ABL passed ISO 9001:2015, ISO14001, OHSAS18001 certificate. we have already cooperated with some top 500 enterprises.
2018, ABL focus more on the Lean Production and preparing for the next five years.
2019, We are going to build a testing center and achieve the higher sales goal.
Our mission
To change the world's view about Chinese product.
To be the leader in precision casting industry
Our dream
- To gain Win-win achievement with all of our clients and supplies
- To be an international famous brand.
- To be a one-hundred-year company
After-sales Service
- Reply you fast within 12 hours.
- Have someone to follow up all your inquiry and order.
- We will offer satisfied quality and prices to you.
FAQ:
1. How to get a quotation?
Please send us drawings in igs, dwg, step etc. together with detailed PDF.
If you have any requirements, please note, and we could provide professional advice for your reference.
2. What if we do not have drawing?
Samples would be available, and we would send you drawing to confirm.
Of course, we would ensure the safety of the drawing.
3. How to pay?
For small quantity, we could provide Paypal, Paypal commission will be added to the order.
For the big one, T/T is preferred.
4. How to ship?
For small quantity, we have cooperation with DHL,TNT, FEDEX, UPS etc
For big quantity, air or sea would be available for you to choose.
5. What about the packing details?
We have our regular packing.
If you have any special requirements, we would be willing to help.
6. What about the delivery time?
It would be 20-30 days normally for the parts to be ready and we had a system to ensure the time.
When you made your order, you would know.