| Customization: | Available |
|---|---|
| Feature: | Rainfall Shower Heads |
| Surface Treatment: | It Can Accept Customize |
| Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
|---|
| Payment Methods: |
|
|---|---|
| Support payments in USD |
| Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
|---|
| Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
|---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Exposed Wall Mount Modern Ablinox Stainless Steel Bath Shower
|
Faucet type |
Bath and shower faucet |
|
Material |
Stainless steel bathroom shower set |
|
Grade |
SUS304 bathroom shower set |
|
Cartridge |
Sedal from Spain / Kerox from Hungary/ Fluhs from Germany/ KCG from Taiwan |
|
Function |
Head shower and hand shower. 2 function shower set |
|
Top shower head |
included bathroom shower set |
|
Handheld shower |
included bathroom shower set |
|
Spray type |
Top shower: rainfall, Handshower: 5 patterns |
|
Installation Type |
Wall mounted bathroom shower set |
|
Spare Parts |
SUS304 Stainless steel braided EPDM/ PEX hoses, rubber seal ring, stainless steel fix base |
|
other service |
Installaton instruction bathroom shower set |
|
Delivery |
Within 30-35 working days after we got your 30% deposit |
|
Packing |
Customized package is acceptable. |
|
Payment |
30% by T/T in advance as deposit, 70% balance before shipment or L/C at sight |









| Steps | Time | |
| Tooling Making | CNC Center | 7 days |
Casting Process |
Wax Injection | 2 days |
| Sand Shell Molding | 5 days | |
| Dewaxing | 1 days | |
| Pouring | 1 days | |
| Cutting | 1 days | |
| Grinding | 1 days | |
| Cleaning | 1 days | |
Machining Process |
CNC | 2 days |
| Drilling & Tapping | 2 days | |
| Welding | 2 days | |
| Stamping | 1 days | |
| Polishing | 5 days | |
Assembling |
Ultrasonic Washing | 1 days |
| Water Testing | 1 days | |
| Assembling | 2 days | |
| Remark: The production time base on standard quantity and process | ||