Customization: | Available |
---|---|
Customized: | Customized |
Function: | Decoration |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Function: | For tube, handrail, balustrade connection |
Diameter: | 38.1/42.4//50.8mm, other sizes can be customized |
Technique: | Stainless steel lost wax casting design |
Surface or finish: | Satin;mirror;electroplating,PVD,etc |
Material Analysis: | SS304 - Nickel>8%, Carbon<0.08% SS316 - Nickel>10%, Carbon<0.03% |
OEM/ODM | Available |
MOQ | 100 PCS |
Package | Foam bag, blank box, wooded case, pallet or as customers' request. |
Factory plant area: Actual area 50,000 square meters
Steps | Time | |
Tooling Making | CNC Center | 7 days |
Casting Process |
Wax Injection | 2 days |
Sand Shell Molding | 5 days | |
Dewaxing | 1 days | |
Pouring | 1 days | |
Cutting | 1 days | |
Grinding | 1 days | |
Cleaning | 1 days | |
Machining Process |
CNC | 2 days |
Drilling & Tapping | 2 days | |
Welding | 2 days | |
Stamping | 1 days | |
Polishing | 5 days | |
Assembling |
Ultrasonic Washing | 1 days |
Water Testing | 1 days | |
Assembling | 2 days | |
Remark: The production time base on standard quantity and process |