Guangdong, China
Business Range:
Arts & Crafts, Auto, Motorcycle Parts & Accessories, Construction & Decoration, Industrial ...
Management System Certification:
ISO 9001, ISO 14001, OHSAS/ OHSMS 18001, IATF16949, QHSE
Import & Export Mode:
Have Own Export License
International Commercial Terms(Incoterms):
FOB, CIF, CFR
OEM/ODM Availability:
Yes
OEM/ODM Service
Sample Available
MEI Awards

Bracket, Wall Bracket, Stainless Steel Wall Bracket manufacturer / supplier in China, offering Stainless Steel Wall Bracket for Handrail, 180 Degree Glass to Glass Bathroom Brass Glass Hinge, Stainless Steel 304 Holder Pipe Handrail Post for 50.8mm Tube and so on.

Diamond Member Since 2009
Audited Supplier

Stainless Steel Wall Bracket for Handrail

Purchase Qty. / Reference FOB Price
50-499 Pieces US $2.58
500+ Pieces US $2
Port: Guangzhou, China
Production Capacity: 100, 000PCS/Month
Payment Terms: L/C, T/T, Western Union, Paypal
Customized: Non-Customized
Style: Pastoral, Simplicity, Classic, Modern, European, Chinese
Stair Railing / Handrail: Stainless Steel
Baluster: Stainless Steel
Stair Tread: Stainless Steel
Surface: Satin or Mirror

You Might Also Like

Loading...

Basic Info.

Model NO.
CC182
Payment
T/T.L/C
Top Handrail Size
38.1mm/42.4mm/50.8mm
Middle Pipe Size
8mm/10mm/12mm/12.7mm
Port of Loading
Guangzhou
Wattanty
11years
Trademark
ABL
Transport Package
1PC/Bag
Specification
CE, ROHS, SGS
Origin
Guangdong
HS Code
730890000
Stainless Steel Wall Bracket for handrail (CC182)

Products decristion:

1) Material: Stainless steel AISI304, AISI316

2)Surface finish: Satin 320#, mirror 800#

3) Size: Suit for 38.1, 42.4, 48.3, 50.8mm tubes

4) Fix to posts with blind rivet nuts and cap screws

5) Easy to clean, Low Maintenance Cost

6) OEM products are available

7) Package: Inner opp bag with white box, outside export standard carton with 5 layers.

8)Payment terms: T/T 30% deposit, balance before delivery. L/C, Paypal.

9)Delivery time: 10-28 days.
We are manufacture that specilied in producing balustrade/handrail/handrail fittings, if you are interested in our products, pls feel free to ontact with us, we will try our best to meet you demand.

Production Process
StepsTime
Tooling MakingCNC Center7 days


Casting Process
Wax Injection2 days
Sand Shell Molding5 days
Dewaxing1 days
Pouring1 days
Cutting1 days
Grinding1 days
Cleaning1 days


Machining Process
CNC2 days
Drilling & Tapping2 days
Welding2 days
Stamping1 days
Polishing5 days

Assembling
Ultrasonic Washing1 days
Water Testing1 days
Assembling2 days
Remark: The production time base on standard quantity and process


Hot  Sell  Product

Stainless Steel Wall Bracket for Handrail


Packing & Delivery


Stainless Steel Wall Bracket for Handrail


Stainless Steel Wall Bracket for Handrail

Company Introduction

ABL was founded in 2008 by Kate Liang, started from a 400 square meters workshop.
In 2009, Supported by customers and suppliers, ABL moved to a 4000 square meter workshop and expand our business all over the world.
In 2012, We have sold our products to more than 200 countries, and our brand existed
in more than 50 countries in the world.
In 2013, We have passed CUPC,NSF,CE and ROHS cetificate,starting entered into the European and American markets.
In 2014, with fast development, ABL moved to a 50000 square meters factory. We have our own stainless steel investment casting production lines and also completed machining equipments.
In 2015, We set up our management team. We have cooperated with some unversities and getting bigger. At the same time, we are also Alibaba training center.
From 2016 to 2017, ABL passed ISO 9001:2015, ISO14001, OHSAS18001 certificate. we have already cooperated with some top 500 enterprises.
2018, ABL focus more on the Lean Production and preparing for the next five years.
2019, We are going to build a testing center and achieve the higher sales goal.


Stainless Steel Wall Bracket for Handrail
Stainless Steel Wall Bracket for Handrail
Stainless Steel Wall Bracket for Handrail
Our mission
To change the world's view about Chinese product.
To be the leader in precision casting industry
Our dream
  1. To gain Win-win achievement with all of our clients and supplies
  2. To be an international famous brand.
  3. To be a one-hundred-year company
FAQ:
1. How to get a quotation?
Please send us drawings in igs, dwg, step etc. together with detailed PDF.
If you have any requirements, please note, and we could provide professional advice for your reference.
   
2. What if we do not have casting drawing?
Samples would be available, and we would send you drawing to confirm.
Of course, we would ensure the safety of the drawing.
   
3. How to pay?
T/T is preferred.
   
4. How to ship?
For small quantity, we have cooperation with DHL,TNT, FEDEX, UPS etc
For big quantity, air or sea would be available for you to choose.

5. What about the packing details?
We have our regular packing.
If you have any special requirements, we would be willing to help.
   
6. What about the delivery time?
It would be 20-30 days normally for the parts to be ready and we had a system to ensure the time.
When you made your order, you would know.
 

Send your message to this supplier

*From:
*To:
avatar Mrs. Landy He
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now