Guangdong, China
Business Range:
Auto, Motorcycle Parts & Accessories, Construction & Decoration, Industrial Equipment & ...
Management System Certification:
ISO 9001, OHSAS/ OHSMS 18001, ISO/TS 16949, QHSE
Import & Export Mode:
Have Own Export License
International Commercial Terms(Incoterms):
FOB, CIF, CFR
OEM/ODM Availability:
Yes
OEM/ODM Service
Sample Available
Overseas Agent / Branch
Distributorship Cooperation

Handrail Fittings, Handrail Elbow, Railing Elbow manufacturer / supplier in China, offering Durable Stainless Steel Angle Elbow (CC68), Ablinox 304 Stainless Steel Pan Handle, Abl Stainless Steel Fitting and so on.

Gold Member Since 2009
Audited Supplier

Durable Stainless Steel Angle Elbow (CC68)

Get Latest Price
Min. Order / Reference FOB Price
100 Pieces US $1/ Piece
Port: Guangzhou, China
Production Capacity: 100, 000PCS/Month
Payment Terms: L/C, T/T, Western Union, Paypal
Connection: Female
Shape: Equal
Head Code: Round
Angle: 90 Degree
Wall Thickness: Sch20
Material: Stainless Steel

You Might Also Like

Loading...

Basic Info

Model NO.: CC68
Technics: Casting
Certification: ASME, DIN, GB
Color: Polished
Surface: Satin or Mirror
Function: Pipe, Handrail Balustrade Connection
Types: 90 Degree, Acute, 135 Degree, Adjustable, Welded,
Size: 33.7/38.1/42.4/48.3/50.8mm
Thickness: 0.8mm to 2.5mm,or Customize
MOQ: 100PCS
Trademark: ABL
Transport Package: Standard Export Cartons
Specification: CE, ROHS, SGS
Origin: Guangdong
HS Code: 730890000

Product Description

Name:Stainless Steel Elbow
Function:Pipe, Handrail balustrade connection
Kinds90 degree, acute, 135 degree, adjustable, welded, etc
Diameter:33.7/38.1/42.4/48.3/50.8mm
Thickness:0.8mm to 2.5mm,or customize
Technique:Sheet Metal Forming Technology
Surface or finish:Satin; mirror; electroplating color(gold ,rose gold)
Photometric analysis:G320 satin and G800 mirror finished
Material Analysis:304 - Nickel > 8%,Carbon < 0.08% ;
316 - Nickel >10%, Carbon <0.03% .
OEM/ODMAvailable
PackagePlastic film, wooden cases ,wooden pallet, or as customers' request

Package:
1. Glass railing: Wood crates
2. Baluster: Pearl cotton inner, 1PCS/box, 4-6boxes/carton
3. Others: Pearl cotton/buble bag inner, outer carton

Installation:
1. Just screw, no welding, easy to intall
2. Detailed installation drawing and instruction of the glass railing will be provided

Payment term:
L/C T/T 30%-50% deposit, balance before delivery and shipment

Delivery time:
20-35days after deposit and drawing confirmation

Notes:
1. It is aesthetic but very useful achievement by the diligent work from our profession designers, precise engineers and skilled workers.

Why choose Guangdong ABLinox Sanitaryware CO.,LTD
1, OEM services are available, welcome to visit our factory or show room before you place an order.
2, high quality control with ISO9001;
3, up to 20 years staircase manufacture whose products export to all over the world;
4, detailed productions and installation drawings are provided;
5, easy to install, only use screws to install, no need welding.
6, new product output with best price and quality.
 
Company nameGREEN ABL INTERNATIONAL LIMITED
FOSHAN ABLINOX SANITARYWARE CO.,LTD
Company scopeSanitary ware
Factory locationZhaoqing
AddressLong Wang Miao Street,Ying Bin Road,National high-tech district,ZhaoQing,Guangdong,China.
Established timeEstablished in 2008
ABLinox Culture1.Everyone love ABLinox product
2.To be a famous international brand
3.Do brand in one hundred
 



Welcome to visit our Factory.

FAQ:

1. How to get a quotation?
Please send us drawings in igs, dwg, step etc. together with detailed PDF.
If you have any requirements, please note, and we could provide professional advice for your reference.

   
2. What if we do not have casting drawing?
Samples would be available, and we would send you drawing to confirm.
Of course, we would ensure the safety of the drawing.
   
3. How to pay?
T/T is preferred.
   
4. How to ship?
For small quantity, we have cooperation with DHL,TNT, FEDEX, UPS etc
For big quantity, air or sea would be available for you to choose.


5. What about the packing details?
We have our regular packing.
If you have any special requirements, we would be willing to help.

   
6. What about the delivery time?
It would be 20-30 days normally for the parts to be ready and we had a system to ensure the time.
When you made your order, you would know.

 

Send your message to this supplier

*From:
*To:
avatar Ms. Ivy
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

People who viewed this also viewed