Guangdong, China
Business Range:
Auto, Motorcycle Parts & Accessories, Construction & Decoration, Industrial Equipment & ...
Management System Certification:
ISO 9001, OHSAS/ OHSMS 18001, ISO/TS 16949, QHSE
Import & Export Mode:
Have Own Export License
International Commercial Terms(Incoterms):
FOB, CIF, CFR
OEM/ODM Availability:
Yes
OEM/ODM Service
Sample Available
Overseas Agent / Branch
Distributorship Cooperation

Investment Casting, Coffer Maker Support, Metal Casting manufacturer / supplier in China, offering Stainless Steel Polishing Precision Casting (coffee maker support), Ablinox 304 Stainless Steel Pan Handle, Abl Stainless Steel Fitting and so on.

Gold Member Since 2009
Audited Supplier

Stainless Steel Polishing Precision Casting (coffee maker support)

Get Latest Price
Min. Order / Reference FOB Price
1 KG US $7.35/ KG
Port: Guangzhou, China
Production Capacity: 2500 Tons/Year
Payment Terms: L/C, T/T, Western Union, Paypal
Casting Method: Sand Casting
Casting Form Material: Metal
Casting Metal: Cast Steel
Casting Form Usage Count: Permanent
Surface Treatment: Base on Clients
Surface Roughness: Ra0.05

You Might Also Like

Loading...

Basic Info

Model NO.: coffer maker support
Coating: Sodium silicate
Machining Tolerance: +/-0.10mm
Standard: AISI
Certification: CE, RoHS, ISO 9001:2000, ISO 9001:2008
Application: Tooling
Ability: 2500 Tons/Year
Casting Process: Investment Casting
Surface Preparation: Polishing, Sand Blasting, Plating, etc
Casting Standard: GB,ISO, ASTM, AISI, DIN, etc
Delivery: 15 to 30 Days
Port: Can Be Any Port
Samples: Available
Trademark: ABLinox
Transport Package: Bag, Carton or as Customer Request
Specification: Base on the quantity
Origin: China
HS Code: 7307190000

Product Description


Stainless Steel Polishing Precision Casting (coffee maker support)Stainless Steel Polishing Precision Casting (coffee maker support)
Application:  Tools  Model:  Investment Casting Parts
Certificate:  ISO9001:2008  Ability:  2500 tons/year
Origin:  Guangdong , China  Port:  Guangzhou,Shenzhen
Samples:  7-25 days  Delivery:  15-35 days
Material Cast iron, ductile cast iron, carbon steel, steel alloy, stainless steel, brass and zinc-alloy.
Usage  Used in metallurgy, automobile, aero, chemical, ship hardware ,engineering industry, etc.
 
   Casting Process:      Investment/Lost Wax Casting /Water Glass Precision Casting
   Casting Material:      Plain Carbon Steel, Stainless Steel, Low Alloy Steel, etc
   Casting Capacity:      Thickness>6mm, Length<1000mm, Weight:0.1kg-100kg
   Casting Standard:      GB,ISO, ASTM, AISI, DIN, etc
  Casting Tolerance:      ISO/GB CT9
   Surface Roughness:      Ra 0.4um-12.5um
   Surface Preparation:      Polishing, Sand Blasting, Plating, Galvanized, Spray-Paint, etc
   Processing Methods:      OEM, Processing with supplied Drawings/Samples, etc


OUR SERVICE:

1. Investment Casting / Cast Steel :  
Casting + Machining + Heat treatment + Surface treatment + Assembly + Package + Sea transport + Customer services 

2. Best Service
  Feedback Time: within 12 hours       
  Quotation Time: within 48 hours
   Mold Making: 7-15 days               
  Sample Making: 5-7 days          
  Delivery Time: 20 to35 days
   Working Hour8:00AM--11:00PM (Beijing Time) , 7days a week, 365 days a year.

COMPANY INTRODUCTION:
Stainless Steel Polishing Precision Casting (coffee maker support)




Welcome to visit our Factory.

FAQ:

1. How to get a quotation?
Please send us drawings in igs, dwg, step etc. together with detailed PDF.
If you have any requirements, please note, and we could provide professional advice for your reference.

   
2. What if we do not have casting drawing?
Samples would be available, and we would send you drawing to confirm.
Of course, we would ensure the safety of the drawing.
   
3. How to pay?
T/T is preferred.
   
4. How to ship?
For small quantity, we have cooperation with DHL,TNT, FEDEX, UPS etc
For big quantity, air or sea would be available for you to choose.


5. What about the packing details?
We have our regular packing.
If you have any special requirements, we would be willing to help.

   
6. What about the delivery time?
It would be 20-30 days normally for the parts to be ready and we had a system to ensure the time.
When you made your order, you would know.

 

Send your message to this supplier

*From:
*To:
avatar Ms. Ivy
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now