Customization: | Available |
---|---|
After-sales Service: | Online Technical Support |
Warranty: | 2 Years |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make at Made-in-china.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1.With our own stainless steel investment casting production lines and machining lines, give you one stop services.
2.With CNC(CNC CENTER),we make the tooling by ourselves.Make you easiler.
3.With 50000 square meters workshop located in Zhaoqing city, near Guangzhou port, transportation is convenient.
4. Production workshop: including ordinary stamping, precision high-speed stamping, laser cutting, laser welding, drilling,
tapping, CNC processing, butt welding, argon arc welding, CNC turning, surface grinder processing, cylindrical grinder
processing, mirror polish processing, etc.
5.We have 15 engineers with strong ability in design and develop new products.
6.With ISO 9001:2015, ISO 14001 and OHSAS 18001 system.
7.With ERP system,We can give you the production and delivery information at the first time. Also if any quality problem,We
can source it and give you the solution very fast.
8.Fast reply within 12 hours.
9.Use Germany Spectrometer and Salty Spray to test the raw material.
10 Production workshop: including ordinary stamping, precision high-speed stamping, laser cutting, laser welding, drilling,
tapping, CNC processing, butt welding, argon arc welding, CNC turning, surface grinder processing, cylindrical grinder
processing, mirror polish processing, etc.
Steps | Time | |
Tooling Making | CNC Center | 7 days |
Casting Process |
Wax Injection | 2 days |
Sand Shell Molding | 5 days | |
Dewaxing | 1 days | |
Pouring | 1 days | |
Cutting | 1 days | |
Grinding | 1 days | |
Cleaning | 1 days | |
Machining Process |
CNC | 2 days |
Drilling & Tapping | 2 days | |
Welding | 2 days | |
Stamping | 1 days | |
Polishing | 5 days | |
Assembling |
Ultrasonic Washing | 1 days |
Water Testing | 1 days | |
Assembling | 2 days | |
Remark: The production time base on standard quantity and process |
Must Read
Buyer Reading
(1) Please be noted that the price in our website is merely the reference price and the actual one is subject to our final
confirmation!
(2) Any problem, requirement and suggestion, please contact us freely, we'd be very pleased to be at your side.
1. Where is your location?
We are located in No.3, Xinglong 3rd Street, Linjiang lndustrial Park, Dawang High-Tech
Zone, Zhaoging City, Guangdong Province, China
2. What is your MOQ requirement?
Our MOQ is 100 piece per fitting
3. How to get sample?
Sample is acceptable. Pls contact with us and advise what sample you would like.
4.How long is your delivery time?
It depends on order quantity and requirements. Normally 7-10 days for samples, 30-55 days for bulk order.
5.What is your payment condition?
T/T, L/C, Cash, etc. Normally 30% by T/T in advance, balance to be paid before shipment.
6. Can you produce according to samples or drawing?
Yes, we can accept OEM and ODM. Our key engineer has more than 15 years in hardware industry
7. How many fittings can you produce in one month?
Generally we can make more than 50,000 pcs monthly.