Guangdong, China
Business Range:
Auto, Motorcycle Parts & Accessories, Construction & Decoration, Industrial Equipment & ...
Management System Certification:
ISO 9001, OHSAS/ OHSMS 18001, ISO/TS 16949, QHSE
Import & Export Mode:
Have Own Export License
International Commercial Terms(Incoterms):
OEM/ODM Availability:
OEM/ODM Service
Sample Available
Overseas Agent / Branch
Distributorship Cooperation

Handrail Pipe Elbow, Handrail Elbow, Railing Fittings manufacturer / supplier in China, offering Stainless Steel 4 Ways Handrail Pipe Elbow (CC69), Ablinox 304 Stainless Steel Door Handle, Abl Stainless Steel Fitting and so on.

Gold Member Since 2009
Audited Supplier

Stainless Steel 4 Ways Handrail Pipe Elbow (CC69)

Get Latest Price
Min. Order / Reference FOB Price
100 Pieces US $3/ Piece
Port: Guangzhou, China
Production Capacity: 50000PCS/Month
Payment Terms: L/C, T/T, D/P, Western Union, Paypal
Connection: Male
Shape: Equal
Head Code: Round
Angle: 90 Degree
Wall Thickness: Sch10s
Material: Stainless Steel

You Might Also Like


Basic Info

Model NO.: CC69
Technics: Casting
Certification: CE
Color: Silver
Size: 8mm 10mm 12mm 12.7mm 16mm 19mm 24mm 38mm 42mm 50mm
Position: Handrail Fittings Connect The Pipes
Diameter: 33.7/38.1/42.4/48.3/50.8mm
Surface: Satin or Mirror
Delivery: 20 to 30 Days
Trademark: ABL
Transport Package: Standard Export Packing
Specification: 8mm 10mm 12mm 12.7mm 16mm 19mm 24mm 38mm 42mm 50mm
Origin: China
HS Code: 83024100

Product Description

Model No:CC69
Name:Stainless Steel Elbow
Function:Pipe, Handrail balustrade connection
Kinds90 degree, acute, 135 degree, adjustable, welded, spring Elbow
Thickness:0.8mm to 2.5mm,or customize
Technique:Sheet Metal Forming Technology
Surface or finish:Satin; mirror; electroplating color(gold ,rose gold)
Photometric analysis:G320 satin and G800 mirror finished
Material Analysis:304 - Nickel > 8%,Carbon < 0.08% ;
316 - Nickel >10%, Carbon <0.03% .
PackagePlastic film, wooden cases ,wooden pallet, or as customers' request
Company Information
Company scopeSanitary ware
Factory locationZhaoqing
AddressLong Wang Miao Street,Ying Bin Road,National high-tech district,ZhaoQing,Guangdong,China.
Established timeEstablished in 2008
ABLinox Culture1.Everyone love ABLinox product
2.To be a famous international brand
3.Do brand in one hundred
Factory plant area:  Actual area 15,000 square meters
Production workshop:  including ordinary stamping, precision high-speed stamping, laser cutting, laser welding, drilling, tapping, CNC processing, butt welding, argon arc welding, CNC turning, surface grinder processing, cylindrical grinder processing, mirror polish processing, etc.
Product Design:  Green ABL system is designed by Spain professionals. We produce professional stainless steel railing system, glass clamps, pipes, bars, stainless steel faucets, stainless steel bathroom accessories, handles and the casting floor drains.
Our Aim: Green ABL series aim to save labor costs during their final installation, and focus in its perfect integration with the handmade metalwork. They are easy to put together, and can be assembled in many different ways, which saves you a great deal of time and money.

We have various types of building material/sanitaryware.
If you want to know more about our products, welcome to contact us and get the catalog.
We are willing to provide with sample for quality and function testing.

Welcome to visit our Factory.


1. How to get a quotation?
Please send us drawings in igs, dwg, step etc. together with detailed PDF.
If you have any requirements, please note, and we could provide professional advice for your reference.

2. What if we do not have casting drawing?
Samples would be available, and we would send you drawing to confirm.
Of course, we would ensure the safety of the drawing.
3. How to pay?
T/T is preferred.
4. How to ship?
For small quantity, we have cooperation with DHL,TNT, FEDEX, UPS etc
For big quantity, air or sea would be available for you to choose.

5. What about the packing details?
We have our regular packing.
If you have any special requirements, we would be willing to help.

6. What about the delivery time?
It would be 20-30 days normally for the parts to be ready and we had a system to ensure the time.
When you made your order, you would know.


Send your message to this supplier

avatar Ms. Ivy

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

People who viewed this also viewed