Stainless Steel Lamp Body Investment Casting
Basic Info
Surface: Satin/Mirror/PVD/Plating
Certificate: ISO9001, RoHS, CE , CUPC
OEM/ODM: Available
Delivery Port:Guangzhou
Delivery Time: 30 to 50 days
Delivery Term: EXW,FOB,CIF,CFR
Product Specification
Investment Casting Parts
Material: Stainless steel, Carbon Steel
Process: Lost wax casting
Standard:GBT6414-1999
Casting Tolerance: CT6 Standard
Weight: 0.1kg to 100kg
Product Range: Automotive, aviation, robot automation, machinery, tools, hardware, electronics, sanitary ware, pump valves, door locks and other stainless steel, carbon steel, alloy steel parts
Tooling made by ourself - We have 2 CNC centers
Complete machining process - We have our own machining, welding, polishing, testing workshops
| material components |
Chemical Composition of Material |
Material
Composition |
201 |
202 |
304 |
316 |
430 |
| C |
≤0.15 |
≤0.15 |
≤0.08 |
≤0.035 |
≤0.12 |
| Si |
≤1.00 |
≤1.00 |
≤1.00 |
≤1.00 |
≤1.00 |
| Mn |
5.5-7.5 |
7.5-10 |
≤2.00 |
≤2.00 |
≤1.00 |
| P |
≤0.06 |
≤0.06 |
≤0.045 |
≤0.045 |
≤0.040 |
| S |
≤0.03 |
≤0.03 |
≤0.030 |
≤0.030 |
≤0.030 |
| Cr |
13-15 |
14-17 |
18-20 |
16-18 |
16-18 |
| Ni |
0.7-1.1 |
3.5-4.5 |
8-10 |
10-12 |
|
| Mo |
|
|
|
2.0-3.0 |
|
Mechanical Property |
Material Item |
201 |
202 |
304 |
316 |
| Tensile Strength |
≥535 |
≥520 |
≥520 |
≥520 |
| Yield Strength |
≥245 |
≥205 |
≥205 |
≥205 |
| Extension |
≥30% |
≥30% |
≥35% |
≥35% |
| Hardness (HV) |
<105 |
<100 |
<90 |
<90 |
Advantange
- With our own stainless steel investment casting production lines and machining lines, give you one stop services.
- With CNC(CNC CENTER),we make the tooling by ourselves.Make you easiler.
- With 50000 square meters workshop located in Zhaoqing city, near Guangzhou port, transportation is convenient.
- Use Germany Spectrometer and Salty Spray to test the raw material.
- We have 15 engineers with strong ability in design and develop new products.
- With ISO 9001:2015, ISO 14001 and OHSAS 18001 system.
- With ERP system,We can give you the production and delivery information at the first time. Also if any quality problem,We can source it and give you the solution very fast.
- Fast reply within 12 hours.








Production Process
| Steps |
Time |
| Tooling Making |
CNC Center |
7 days |
Casting Process |
Wax Injection |
2 days |
| Sand Shell Molding |
5 days |
| Dewaxing |
1 days |
| Pouring |
1 days |
| Cutting |
1 days |
| Grinding |
1 days |
| Cleaning |
1 days |
Machining Process |
CNC |
2 days |
| Drilling & Tapping |
2 days |
| Welding |
2 days |
| Stamping |
1 days |
| Polishing |
5 days |
Assembling |
Ultrasonic Washing |
1 days |
| Water Testing |
1 days |
| Assembling |
2 days |
| Remark: The production time base on standard quantity and process |
Our mission
To change the world's view about Chinese product.
To be the leader in precision casting industry
Our dream
- To gain Win-win achievement with all of our clients and supplies
- To be an international famous brand.
- To be a one-hundred-year company
After-sales Service
- Reply you fast within 12 hours.
- Have someone to follow up all your inquiry and order.
- We will offer satisfied quality and prices to you.