Guangdong, China
Business Range:
Auto, Motorcycle Parts & Accessories, Construction & Decoration, Industrial Equipment & ...
Management System Certification:
ISO 9001, OHSAS/ OHSMS 18001, ISO/TS 16949, QHSE
Import & Export Mode:
Have Own Export License
International Commercial Terms(Incoterms):
OEM/ODM Availability:
OEM/ODM Service
Sample Available
Overseas Agent / Branch
Distributorship Cooperation

Spider, Glass Wall Spider, Stainless Steel Spider manufacturer / supplier in China, offering Stainless Steel Glass Spider for Glass Wall (CC130), Ablinox 304 Stainless Steel Door Handle, Abl Stainless Steel Fitting and so on.

Gold Member Since 2009
Audited Supplier

Stainless Steel Glass Spider for Glass Wall (CC130)

Get Latest Price
Min. Order / Reference FOB Price
1 Piece US $15/ Piece
Port: Guangzhou, China
Production Capacity: 20000 Per Month
Payment Terms: L/C, T/T, D/P, Western Union, Paypal
material: Stainless Steel304/316
Size: 200mm/220mm/250mm/300mm
Surface: Satin/Mirror
Glass(T): 6 to 20mm
Delivery Time: 15 to 30 Days Upon Down Payment
Type: Fasteners

You Might Also Like


Basic Info

Model NO.: CC130
Trademark: ABL
Transport Package: According to Customer′s Request.
Specification: CE, ROHS, SGS
Origin: Guangdong, China
HS Code: 730890000

Product Description

------->>> Product Description
Product NameABL Stainless Steel Glass Spider for Glass Wall
Material                 SS304/316
FinishSatin/Mirror polish
Class(T)6 to 20mm
Size250mm, 220mm, 210mm, 180mm, 170mm, 160mm, 150mm, or depends on your size
CertificateISO 9001-2000, Product Quality Certificate
Usage Glass,railing,balcony,etc
PackingBubble Wrap inside,Steel Pallet outside
Delivery Time15 to 30 days upon down payment

------->>> Our advantages
1.We can support sample for you..
2.OEM/ODM products are available.
3.Quick and nice after-sale service.
4.Fast and safe delivery.
5.Solid casting and full welding process.
6. Easy install and secure material.
7. Special application upon you request.
------->>> About Us

Company name
Company scopeSanitary ware
Factory locationZhaoqing
AddressLong Wang Miao Street,Ying Bin Road,National high-tech district,ZhaoQing,Guangdong,China.
Established timeEstablished in 2008
ABLinox Culture1.Everyone love ABLinox product
2.To be a famous international brand
3.Do brand in one hundred

 Factory plant area:  Actual area 15,000 square meters
Production workshop:  including ordinary stamping, precision high-speed stamping, laser cutting, laser welding, drilling, tapping, CNC processing, butt welding, argon arc welding, CNC turning, surface grinder processing, cylindrical grinder processing, mirror polish processing, etc.
Product Design:  Green ABL system is designed by Spain professionals. We produce professional stainless steel railing system, glass clamps, pipes, bars, stainless steel faucets, stainless steel bathroom accessories, handles and the casting floor drains.
Our Aim: Green ABL series aim to save labor costs during their final installation, and focus in its perfect integration with the handmade metalwork. They are easy to put together, and can be assembled in many different ways, which saves you a great deal of time and money.

We have various types of building material/sanitaryware.
If you want to know more about our products, welcome to contact us and get the catalog.
We are willing to provide with sample for quality and function testing.

Welcome to visit our Factory.


1. How to get a quotation?
Please send us drawings in igs, dwg, step etc. together with detailed PDF.
If you have any requirements, please note, and we could provide professional advice for your reference.

2. What if we do not have casting drawing?
Samples would be available, and we would send you drawing to confirm.
Of course, we would ensure the safety of the drawing.
3. How to pay?
T/T is preferred.
4. How to ship?
For small quantity, we have cooperation with DHL,TNT, FEDEX, UPS etc
For big quantity, air or sea would be available for you to choose.

5. What about the packing details?
We have our regular packing.
If you have any special requirements, we would be willing to help.

6. What about the delivery time?
It would be 20-30 days normally for the parts to be ready and we had a system to ensure the time.
When you made your order, you would know.


Send your message to this supplier

avatar Ms. Ivy

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

People who viewed this also viewed