Still deciding? Get samples of $ !
Order Sample
|
| Customization: | Available |
|---|---|
| Warranty: | 10 |
| Certification: | ISO9001, RoHS, CE |
| Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
|---|
| Payment Methods: |
|
|---|---|
| Support payments in USD |
| Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
|---|
| Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
|---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
| Function: | For tube, handrail, balustrade connection |
| Diameter: | 38.1/42.4//50.8mm, other sizes can be customized |
| Technique: | Stainless steel lost wax casting design |
| Surface or finish: | Satin;mirror;electroplating,PVD,etc |
| Material Analysis: | SS304 - Nickel>8%, Carbon<0.08% SS316 - Nickel>10%, Carbon<0.03% |
| OEM/ODM | Available |
| MOQ | 100 PCS |
| Package | Foam bag, blank box, wooded case, pallet or as customers' request. |

Factory plant area: Actual area 50,000 square meters







Production Process
| Steps | Time | |
| Tooling Making | CNC Center | 7 days |
Casting Process |
Wax Injection | 2 days |
| Sand Shell Molding | 5 days | |
| Dewaxing | 1 days | |
| Pouring | 1 days | |
| Cutting | 1 days | |
| Grinding | 1 days | |
| Cleaning | 1 days | |
Machining Process |
CNC | 2 days |
| Drilling & Tapping | 2 days | |
| Welding | 2 days | |
| Stamping | 1 days | |
| Polishing | 5 days | |
Assembling |
Ultrasonic Washing | 1 days |
| Water Testing | 1 days | |
| Assembling | 2 days | |